From feasibility study to the project delivery, Marcon Infrastructure Group has assisted the developer through planning, engineering, and construction stages.
In additional to standard road, drainage, sewer reticulation and water reticulation design, Marcon Infrastructure Group has completed design of temporary drainage works and sewer eduction system to provide temporary drainage and sewerage solution for this site before the ultimate downstream infrastructure is constructed in the near future.